7 years ago in Principles of Management & SAD

Nassi - Shneiderman charts

[A] Are being replaced by flowcharts
[B] Often describe over lapping control structures
[C] Are made up of boxes within boxes
[D] Both A and C
Loading...
Next Question

Overall Stats

Attempted 40
Correct 5
Incorrect 10
Viewed 25

Answers

Guest
Guest
Muhammad Asghar
Muhammad Asghar - 4 years ago

Muhammad Asghar from Vehari, Pakistan is saying Are made up of boxes within boxes is correct answer

Veerababu Nani
Veerababu Nani - 4 years ago

Veerababu Nani from India is saying Often describe over lapping control structures is correct answer

HIFZURRAHAMAN
HIFZURRAHAMAN - 4 years ago

HIFZURRAHAMAN from Delhi, India is saying Are being replaced by flowcharts is correct answer

Khadim Hussain
Khadim Hussain - 4 years ago

Khadim Hussain from Rawalpindi, Pakistan is saying Are made up of boxes within boxes is correct answer

Nazia Sayed
Nazia Sayed - 4 years ago

Nazia Sayed from Mumbai, India is saying Both A and C is correct answer

Related Questions

Which of the following might be output as a result of using a CASE tool?

  • [A] Programming code
  • [B] Flowchart and adopt flow diagram
  • [C] Prototype and cost/benefit analysis
  • [D] All of the above

A programmer would most likely prepare a

  • [A] General System flowchart
  • [B] Specific system flowchart
  • [C] General program flowchart
  • [D] specific program flowchart

A system analyst design a new design by ?

  • [A] Identifying sub system and interfaces between sub system
  • [B] Adopting a developed system to the present environment
  • [C] Developing a system as a large, single unit
  • [D] Propose alternatives to the current system