Davinder Singh
Davinder Singh - 4 years ago in Principles of Management & SAD

Which of the following might be output as a result of using a CASE tool?

[A] Programming code
[B] Flowchart and adopt flow diagram
[C] Prototype and cost/benefit analysis
[D] All of the above
Loading...

Overall Stats

Attempted 76
Correct 17
Incorrect 16
Viewed 43

Answers

Guest
Guest
Sadhanagiri Phani
Sadhanagiri Phani - 2 months ago

Sadhanagiri Phani from Hyderabad, India is saying All of the above is correct answer

Jaya Sharma
Jaya Sharma - 2 months ago

Jaya Sharma from Shimla, India is saying Flowchart and adopt flow diagram is correct answer

Phani
Phani - 3 months ago

Phani from Hyderabad, India is saying Programming code is correct answer

Khyati Pandya
Khyati Pandya - 4 months ago

Khyati Pandya from Mumbai, India is saying All of the above is correct answer

TLL
TLL - 1 year ago

TLL from Riyadh, Saudi Arabia is saying All of the above is correct answer

Related Questions

Davinder Singh
Davinder Singh - 4 years ago in Principles of Management & SAD
A system investigation may result from ?
  • [A] An analysis investigation
  • [B] A scheduled systems reviewed
  • [C] A manager's formal request
  • [D] All of above
Davinder Singh
Davinder Singh - 4 years ago in Principles of Management & SAD
User friendly computers have ensured that ?
  • [A] Management requires no system analysis and design
  • [B] Programmers are no longer needed
  • [C] Structured programming is not needed
  • [D] None of above
Davinder Singh
Davinder Singh - 4 years ago in Principles of Management & SAD
Announcement of MIS implementation is made by ?
  • [A] Operational level managers
  • [B] Tactical level managers
  • [C] The president
  • [D] All of the above
Davinder Singh
Davinder Singh - 4 years ago in Principles of Management & SAD
Errors can be found by outsiders during ?
  • [A] Alpha testing
  • [B] Beta testing
  • [C] Structures walk through
  • [D] Debugging
Davinder Singh
Davinder Singh - 4 years ago in Principles of Management & SAD
Rapid prototyping proves the quality of design by?
  • [A] Having a program simulate the real system
  • [B] Having the system analyst present an overview of the design to users,programmers and cosultants
  • [C] Having a data flow diagram
  • [D] Both A and B