3 years ago
in Time and Work
Here 10 programmers, type 10 lines within 10 minutes then 60 lines can be typed within 60 minutes. How many programmers are needed?
Loading...
Overall Stats
Attempted
7
Correct
2
Incorrect
2
Viewed
3
Answers
Avleen saini -
1 year ago
Avleen saini from New Delhi, India is saying 20 is correct answer
Akki 99 -
1 year ago
Akki 99 is saying 10 is correct answer
Sayed badruzama -
3 years ago
Sayed badruzama from Mumbai, India is saying 10 is correct answer
Nazia Sayed -
3 years ago
Nazia Sayed from Mumbai, India is saying None of these is correct answer
Related Questions
A and B working together completed a job in 5 days. If A works twice as efficiently as he actually did and B works 1/3 of actual efficiency, the work would have completed in 3 days. Find the for A to complete the job alone.
- [A] 6(1/2)
- [B] 6(1/4)
- [C] 6(3/4)
- [D] 12(1/2)
- [E] None of these
If 12 men and 16 boys can do a piece of work in 5 days; 13 men and 24 boys can do it in 4 days, then the ratio of the daily work done by a man to that of a boy is:
- [A] 4 : 1
- [B] 3 : 1
- [C] 1 : 1
- [D] 2 : 1
- [E] 1 : 2
Two pipes A and B can fill a cistern in 12 min and 16 min respectively. Both the pipes are opened together for a certain time but due to some obstruction the flow of water was restricted to 7/8 of full flow in pipe A and 5/6 of full in pipe B. This obstruction is removed after some time and tank is now filled in 3 min from that moment. How long was it before the full flow.
- [A] 8 min
- [B] 3 min
- [C] 5.6 min
- [D] 4.5 min
- [E] None of these